Applying Epoxy Basecoat & Flakes
At 8:41 in
What is Epoxy?
What happens here
After the primer is allowed to dry for approximately five hours, the next step involves applying an epoxy basecoat. This basecoat is identified as Epoxy-Shell 1000 EPL (Extended Pot Life) from Rust-Oleum. Key features of this product include UV resistance (though not full UV stability), and a 60-minute working time, which is ample for application. It also possesses self-leveling properties so pronounced that it can simply be poured out in ribbons onto the floor and then minimally touched with a squeegee or roller to spread, and it will flatten out to a smooth finish. After applying the basecoat, decorative flakes are immediately broadcast over the wet surface.
Goal: Apply a self-leveling epoxy basecoat and decorative flakes for aesthetic appeal and enhanced protection.
Tools and materials
- Bucket
- Roller
- Squeegee
- Decorative flakes
What they say
(1,084 characters)Hide
What they say
(1,084 characters)Auto-generated from the video audio.