Ground Preparation & Drain Tile Installation
At 6:03 in
We might be Losing Money on this one.... #1/4
What happens here
The excavator continues to work on the embankment, digging a trench that will form the foundation for the new retaining wall. The trench is then filled with a layer of gravel to ensure proper drainage and a stable footing for the base blocks. A perforated drain tile is laid in front of and below the wall's eventual position, designed to collect and redirect groundwater away from the structure. This is a critical step in preventing hydrostatic pressure buildup and extending the lifespan of the new retaining wall.
Goal: The crew uses the excavator to dig a trench, which is then filled with gravel to create a stable base for the new wall. They also install a drain tile system to manage water infiltration, an essential step for long-term wall stability.
Tools and materials
- Daewoo 75V Excavator Daewoo
- Gravel
- Perforated Drain Tile
What they say
(1,174 characters)Hide
What they say
(1,174 characters)Auto-generated from the video audio.