Base Preparation and First Course Block Installation
At 15:37 in
We might be Losing Money on this one.... #1/4
What happens here
After clearing and initial excavation, the trench receives a layer of gravel which is then compacted using a plate compactor to create a stable base. Workers meticulously lay the first course of retaining wall blocks, using a level and a rubber mallet to ensure each block is perfectly level and aligned. This base course is critical for the stability and longevity of the entire wall. Drainage tiles are installed in front of and below the wall, and behind the wall within a geogrid system to effectively manage subsurface water, with special attention to not resting the blocks directly on the drain tile to maintain its function.
Goal: The trench is prepared by compacting gravel and installing the first course of new retaining wall blocks, focusing on precise leveling and proper drainage.
Tools and materials
- ASV RT-75 Posi-Track Skid Steer ASV
- Level
- Plate Compactor
- Rubber Mallet
- Shovels and Rakes
- Drain Tile
- Gravel
- Retaining Wall Blocks