Final Grading and Soil Preparation
At 15:56 in
We found SOMETHING BIG buried & its not good. Landscaping & demolition Project- 4K video
What happens here
After the main demolition and removal of large debris, the tracked ASV RT-75 skid steer is used to spread the excavated fill soil evenly across the former pool basin. The operator then begins incorporating organic materials, likely the stripped topsoil or compost, into the top layer of the fill. This process helps establish a proper grade that ensures water runoff away from the house and prepares the soil for new landscaping, such as seeding or sod installation.
Goal: Evenly spread and grade the fill soil in the former pool area, incorporating organic material to create a proper drainage slope and prepare the site for new landscaping.
Tools and materials
- ASV RT-75 Tracked Skid Steer ASV — Spreading and leveling fill soil, and incorporating organic material
- Bucket Attachment — Moving and distributing soil for grading
- Rake — Fine-tuning the grade and evening out the organic material
- Wheelbarrow — Transporting smaller amounts of organic material or spreading by hand
- Fill Soil Local supplier — Backfilling the pool basin
- Organic Material — Mixing into the top layer of fill for landscaping
What they say
(1,720 characters)Hide
What they say
(1,720 characters)Auto-generated from the video audio.