What happens here

After the main demolition and removal of large debris, the tracked ASV RT-75 skid steer is used to spread the excavated fill soil evenly across the former pool basin. The operator then begins incorporating organic materials, likely the stripped topsoil or compost, into the top layer of the fill. This process helps establish a proper grade that ensures water runoff away from the house and prepares the soil for new landscaping, such as seeding or sod installation.

Goal: Evenly spread and grade the fill soil in the former pool area, incorporating organic material to create a proper drainage slope and prepare the site for new landscaping.

Tools and materials

  • ASV RT-75 Tracked Skid Steer ASV — Spreading and leveling fill soil, and incorporating organic material
  • Bucket Attachment — Moving and distributing soil for grading
  • Rake — Fine-tuning the grade and evening out the organic material
  • Wheelbarrow — Transporting smaller amounts of organic material or spreading by hand
  • Fill Soil Local supplier — Backfilling the pool basin
  • Organic Material — Mixing into the top layer of fill for landscaping

What they say

Hide

all right let's go [Music] all right guys take your best guess in the comments down below what you think he's doing at this stage of the project then in a few moments I'm going to answer you and tell you exactly what he's doing [Music] so he's pretty carefully separating this dirt why do you think he's doing that so when we're demolishing and removing a swimming pool we divide the scope of the work into different segments there's the demolition and the removal part which you've seen today and then there's the fill soil in the structural zone that is where we fill it up using a very select type of material that's compatible that won't settle out but as we get closer to the top we've set it in other videos we like to incorporate more organic material into the top layer sometimes that organic material can come from on-site now when they install a swimming pool initially they always keep the grade higher than the surrounding grades that means that we've got to extend out into the yard to lower everything down to make sure that all of the water flows the right way and we don't end up with a swimming pool again as we get closer to the top we'll go into the yard and start stripping off any organic material we can and then carefully placing that in the upper zone of the where the swimming pool used to be when it's all said and done then we'll bring in a load of pulverized screened black dirt spread and grade that over the surface and then prep that for seed or sod whatever the customer likes I hope you like today's video we still have a little bit work left to do on this jobsite if you want more videos like this just tell me more jobsite videos and I'll make them for you god bless you guys go get up