Skip to main content

Demolish and Remove Concrete Decking

1:05
21:44
386.7K views

At 1:05 in

We found SOMETHING BIG buried & its not good. Landscaping & demolition Project- 4K video

What happens here

Using a Volvo skid steer loader equipped with a grapple attachment, large sections of broken concrete decking surrounding the pool are carefully lifted and removed. The operator maneuvers the machine to grab these heavy pieces and transfer them out of the main pool basin. The narrator notes that the machine's solid rubber tires, while puncture-proof, offer less traction on loose dirt compared to air-filled tires.

Goal: Clear the pool's concrete decking and surrounding debris.

Tools and materials

  • Grapple Attachment — Gripping and moving large concrete pieces
  • Solid Rubber Tires — Providing puncture resistance during demolition
  • Volvo Skid Steer Loader MC115C Volvo — Breaking and removing concrete decking

What they say

Hide

gonna see that in just a little bit so you guys probably noticed that the tires on this machine are solid rubber they're not air filled and you would think that they would do great on a demolition job like this but in fact the opposite is true because there's no air in them there's no give meaning that they really don't grab on to the dirt instead they just bite right through it and it actually ends up giving you less traction now he's got to go pretty slow as he goes down the slight incline because

Auto-generated from the video audio.