Build Terraced Wall & Step-Downs Amidst Snowfall
4:10
12:46
64.1K views
At 4:10 in
We find Buried problems
What happens here
As the construction progresses, the video captures the team continuing to build the lower terraced wall and addressing unexpected challenges. Snow begins to fall during this stage. The crew starts constructing a step-down feature by stacking two concrete blocks for each step, ensuring they are leveled and properly based on compacted gravel. This maintains the required height for the graded landscape and addresses the varying ground levels.
Tools and materials
- Level
- Retaining Wall Blocks
- Rubber Mallet
- Gravel Unspecified