Prepare Opening and Install Tracks
0:00
0:19
11.4K views
At 0:00 in
We aren’t usually in the business of closing off our spaces! #shorts
What happens here
Before beginning the installation, ensure the opening is properly prepared. This involves measuring the width and height to confirm it matches the door specifications. The opening must be plumb (vertically straight) and level (horizontally flat) to ensure the doors operate correctly. Install the top track securely to the header of the opening using appropriate fasteners. If required by the door system, also install the bottom track or pivot brackets firmly to the floor or sill, ensuring it is perfectly aligned with the top track.
Goal: Ensure the door opening is ready and the top and bottom tracks are installed
Tools and materials
- Drill — Drilling pilot holes and driving fasteners
- Level — Checking the plumb and level of the opening and tracks
- Screwdriver Set — Tightening screws
- Tape Measure — Measuring the opening dimensions
- Bottom Track/Pivot Brackets — Guiding the bottom of the bi-fold door panels
- Fasteners — Securing the tracks to the opening
- Shims — Leveling and plumbing the tracks if the opening isn't perfect
- Top Track — Supporting the top of the bi-fold door panels