Skip to main content

Implement Proper Soil Grading

0:40
11:03
7.5K views

At 0:40 in

Waterproofing contractors HATE when you know THIS

What happens here

Begin bringing in new topsoil or suitable fill dirt to establish a "positive pitch" around the entire perimeter of the house. The goal is to create a slope that directs water away from the foundation. Aim for a minimum slope of 6 inches over the first 10 feet away from the house. Ensure the final grade is at least 8 inches below the sill plate (the treated wood resting on top of the concrete foundation) to prevent moisture from wicking into the framing of the house. Use shovels and rakes to evenly spread and compact the new soil, working to create a smooth transition.

Goal: Create a positive slope to divert water away from the foundation.

Tools and materials

  • Level — checking slope consistency, Rakes Unknown
  • Topsoil/Fill Dirt — creating positive grade

What they say

Hide

it it we're bringing the grade up around the house cuz they're having massive water issues in the basement. And this is getting dirt. And then this is getting all trimmed up and getting dirt behind it. bringing the grade up around the house a little bit. It it this was all in mulch. Then we took all that out, but this is also coming up a bit in here. A lot of the water is running through here and washing out around here. So, we're going to try and at least fix it so it's not going to flow towards the house. At least it's blowing away from the house. As you can see, we brought in a lot of dirt already. Yeah. Bringing it up. Our

Auto-generated from the video audio.