Plan Layout and Start First Rows
At 1:53 in
Watch This Before Installing laminate
What happens here
Begin by establishing the starting point for the flooring installation. Typically, flooring is laid vertically from a main entrance. For this project, a mudroom is the starting point, so the planks will be laid vertically from that wall. It's crucial to lay the first planks to create a staggered pattern. The first plank should be full length, the second approximately three-quarters length, and the third half-length. The remaining cut-off pieces from the end of a row should be saved, as they can be used to start subsequent rows, minimizing waste. Use a flooring cutter or miter saw to cut planks to the desired lengths.
Goal: Determine the starting point and begin laying the first rows with a staggered pattern.
Tools and materials
- Flooring Cutter
- Tape Measure
What they say
(1,465 characters)Hide
What they say
(1,465 characters)Auto-generated from the video audio.