Prepare Vehicle and Assess Snow Conditions
0:00
18:39
587.8K views
At 0:00 in
UTV plowing deep snow
What happens here
The video starts with the utility vehicle, a Gravely Atlas JSV, covered in snow. The operator manually clears the windshield and roof to ensure clear visibility before starting the vehicle. The date is confirmed as October 20, 2020, and the snow is described as 6-8 inches of heavy, wet 'heart attack snow,' emphasizing its density and the challenge it poses for removal.
Goal: Begin by clearing accumulated snow from the utility vehicle's windshield and roof. Start the vehicle and assess the snow conditions, noting its depth and consistency, which in this case is heavy, wet snow (6-8 inches).
Tools and materials
- Gravely Atlas JSV Utility Vehicle
- Snow Shovel or Brush
What they say
(385 characters)Hide
What they say
(385 characters)Auto-generated from the video audio.