Lower Machine and Test
14:10
15:00
20.6K views
At 14:10 in
Upgrading my skid Loader for Snow 4K
What happens here
Once both tracks are installed and correctly tensioned, carefully use the second skid steer to lift the SVL 97-2 off the support blocks. Remove the blocks from underneath and gently lower the machine back to the ground. Perform a visual inspection and a short test drive to ensure everything is functioning correctly and the new tracks are secure. This includes checking for any unusual noises or vibrations.
Goal: Safely return the skid steer to the ground and verify proper track installation.
What they say
(542 characters)Hide
What they say
(542 characters)Auto-generated from the video audio.