What happens here
After all stringers have been installed, take a moment to inspect the entire framework. Verify that all stringers are securely fastened, properly spaced, and appear plumb and level. Check for any loose connections or misalignments. The completed structure should form a sturdy and uniform base for the subsequent installation of stair risers and treads.
Goal: Ensure all stringers are correctly installed
Tools and materials
- Installed Stair Stringer Framework N/A — The completed assembly to be inspected
- Spirit Level — To double-check the plumb and level of the installed stringers