Site Assessment and Planning
At 0:00 in
Turning a Slope into a Flat back Yard 4K
What happens here
Initially, the crew walks through the proposed area for the berm, identifying a metal post marking the property line. They discuss the elevation increase, aiming for approximately 2 to 3.5 feet, and how this new elevation will transition into the existing landscape. Plans include leveling off the top portion for a fire pit and sloping the sides for drainage. The need for erosion control, potentially using netting or silt fence, is also discussed, along with the logistics of material delivery by dump truck, highlighting potential access challenges.
Goal: The team assesses the existing landscape, identifies the property line, and discusses the desired height and slope of the new berm, considering factors like erosion control and the need for a flat area for a fire pit.
Tools and materials
- Marking Paint/Stakes
- Measuring Tape
What they say
(2,496 characters)Hide
What they say
(2,496 characters)Auto-generated from the video audio.