Excavate Initial Pit and Trench

0:00
0:47
14.4K views

At 0:00 in

tunneling underneath concrete is the act of a champion

What happens here

Begin by excavating a large pit around the downspout at the building's foundation to accommodate connections and start the buried drainage pipe. From this pit, a trench is dug extending away from the building. The trench needs to maintain a consistent downward slope to ensure effective water flow by gravity.

Goal: Create the main excavation for the drainage system.

Tools and materials

  • Line Level — Checking the slope of the trench
  • Measuring Tape — Measuring trench depth and slope
  • Shovel — Digging the downspout pit and trench
  • Wheelbarrow — Transporting excavated soil away from the work area