Skip to main content

Connect Water Line and Fill Tank

24:00
26:09
19K views

At 24:00 in

Tire Water Tank Install | Simple Start to Finish Tutorial for Your Farm

What happens here

Ensure the water supply line (black poly pipe) is securely connected to the ball valve and float valve assembly. Once all plumbing connections are verified and secure, open the main water valve to allow water to flow into the tank. The MegaFlow float valve will automatically regulate the water level, filling the tank to the set point. Observe the water flow and check for any leaks in the system. The well is set to deliver 12-13 gallons per minute, ensuring a quick fill.

Goal: Connect the main water supply line to the float valve, then open the valve to fill the tank with water.

Tools and materials

  • Wrenches

What they say

Hide

with it for sure. What we're going to do is we'll tie a little knot in here once we get to the level that we want. And there'll also be a knot on this end. So, we'll run it through the valve. Pull that through. This is what opens and closes our valve. This valve will do 36 gallons a minute at 30 PSI. It is a mega flow valve. We're going to fill this tank up pretty quickly, guys. Drain plug in place. And I also set this up where I

Auto-generated from the video audio.