Skip to main content

Insert First Ceiling Panel

0:00
0:37
28.4K views

At 0:00 in

This zip up going in real quick!!

What happens here

The first step involves carefully lifting a long, ribbed under-deck ceiling panel and inserting one of its long edges into a pre-installed black perimeter wall channel. The panel is then pushed firmly upwards to ensure it is properly seated and secured within this channel, forming the starting point for the under-deck ceiling.

Goal: Begin installing the drainage panels

Tools and materials

  • Perimeter Wall Channel — Receiving and securing the first edge of the panel (pre-installed)
  • Under-Deck Ceiling Panel — Forming the ceiling and directing water away