Insert First Ceiling Panel
0:00
0:37
28.4K views
At 0:00 in
This zip up going in real quick!!
What happens here
The first step involves carefully lifting a long, ribbed under-deck ceiling panel and inserting one of its long edges into a pre-installed black perimeter wall channel. The panel is then pushed firmly upwards to ensure it is properly seated and secured within this channel, forming the starting point for the under-deck ceiling.
Goal: Begin installing the drainage panels
Tools and materials
- Perimeter Wall Channel — Receiving and securing the first edge of the panel (pre-installed)
- Under-Deck Ceiling Panel — Forming the ceiling and directing water away