Skip to main content

This Tractor is TRANSFORMED! Replacing a Worn Out Busted Culvert Pipe

14:21
33.4K views

Video by Stoney Ridge Farmer

Stoney Ridge Farmer

What happens here

This project details the replacement of an inadequate 8-inch corrugated plastic culvert pipe with a much larger, heavy-duty 24-inch steel pipe to improve water flow and prevent road washout. The process involves using a tractor with a backhoe attachment to excavate the old pipe and prepare the trench, followed by carefully installing the new, larger pipe. Finally, a skid steer is used to backfill the trench and grade the road, ensuring proper water diversion and a stable road surface.