Site Walk-through and Electrical Check
At 2:42 in
This is NOT a Typical Tear out
What happens here
Prior to commencing the main demolition, workers conduct a site walk-through, identifying specific areas needing attention. They examine the existing river rock and normal edging along the house, noting areas that were previously covered. Attention is drawn to the front stoop, which includes patio blocks and a concrete slab. An existing power outlet near the stoop is tested, with the worker noting it might be tied to a light switch when it initially doesn't work. Another outlet is tested and found to be functional, indicating proper electrical supply to the work area.
Goal: Assess the existing landscape features, identify the stoop's construction, and verify electrical power for tools.
Tools and materials
- Extension Cord (orange)
- Outdoor Electrical Outlet
- Work Gloves
What they say