Rough Grading Behind the Retaining Wall
7:42
11:45
29.5K views
At 7:42 in
This DESTROYS many Retaining walls! #fail #guaranteed
What happens here
With the cap blocks installed, a skid steer begins to spread loose soil and fill material across the area directly behind the retaining wall. This is the initial rough grading, where the soil is distributed to begin shaping the landscape. Workers follow with rakes to fine-tune the grading and spread the soil evenly, preparing for eventual compaction and final landscaping. This step is crucial for establishing the base layer of the backfill.
Goal: A skid steer is used to spread and rough grade soil behind the newly capped retaining wall, initiating the backfilling process.
Tools and materials
- Rake
- Skid Steer
- Fill Soil N/A
What they say
(270 characters)Hide
What they say
(270 characters)Auto-generated from the video audio.