Execute Final Grading with Proper Drainage
At 8:41 in
This DESTROYS many Retaining walls! #fail #guaranteed
What happens here
With the capstones installed and rough grading complete, the focus shifts to creating a precise final grade. The creator (in an inset video) explains the critical importance of proper drainage. The grade should be sloped away from the retaining wall, ensuring that rainwater or other moisture flows away from the wall's face and over the capstones, preventing water from pooling behind it. It's emphasized that creating a 'dam' effect where water is trapped behind the wall is detrimental and will lead to structural failure over time due to hydrostatic pressure. A channel can be created to direct water, but it must have an outlet away from the retaining wall. Most importantly, never direct downspouts or sump pump discharge pipes directly behind a retaining wall, as this will introduce excessive water, guaranteed to compromise the wall's integrity and eventually lead to its failure. The wall is designed to handle a certain amount of water, but direct, concentrated flow is a 'giant no-no' and a 'disaster eventually waiting to happen'.
Goal: The area behind the retaining wall is precisely graded to create a positive slope away from the wall, ensuring efficient water runoff and preventing hydrostatic pressure buildup. Critical warnings are issued regarding improper drainage practices.
Tools and materials
- Rake
- Shovel
What they say
(2,241 characters)Hide
What they say
(2,241 characters)Auto-generated from the video audio.