Building the Double Pyramid Steps
8:09
13:51
43.7K views
At 8:09 in
The worst Contractor of the year award. 4K
What happens here
Workers continue to build up the retaining wall and form the integrated steps in the 'double pyramid' style. Blocks are placed in a stepped pattern, with each subsequent layer set back slightly to create the stair treads. Gravel is continuously backfilled behind the blocks and within the hollow cores of the blocks to provide proper drainage and stability. The steps are carefully measured and leveled to ensure consistent rise and run.
Goal: Construct the integrated steps and retaining wall layers following the 'double pyramid' design.
Tools and materials
- Mallet — Adjusting blocks
- Retaining Wall Blocks — Building the steps and wall
- Shovel — Backfilling with gravel
- Skid Steer Loader Bobcat S185 — Delivering gravel for backfilling
- Small Rake/Brush — Spreading and leveling gravel
- Spirit Level Milwaukee — Ensuring blocks are level
- Tape Measure — Measuring step dimensions
- Gravel — Backfill for drainage and stability
What they say
(1,963 characters)Hide
What they say
(1,963 characters)Auto-generated from the video audio.