Initial Grading Pass (Creating a Shed Crown)
At 2:33 in
The worlds Most Advanced Road grader!
What happens here
With the grader attached and controls understood, the operator begins the first pass of grading on a section of the gravel road. The goal is to establish a 'shed crown' where the center of the road is slightly higher than the edges, allowing water to drain off. The operator demonstrates raising one side of the grader while lowering the other to achieve this slope. Visual indicators, such as a red grade mark on the hydraulic cylinder, help in setting the desired depth and pitch from inside the skid steer's cab. The extended side plates of the grader are noted for their effectiveness in collecting and moving material, preventing spills and allowing for longer passes.
Goal: Establish a shed crown on the road surface to ensure proper water drainage.
Tools and materials
- Kubota SVL 75-3 Skid Steer Kubota — Operating the grader
What they say
(1,258 characters)Hide
What they say
(1,258 characters)Auto-generated from the video audio.