Construct and Place Pit Liner

4:15
27:37
54.7K views

At 4:15 in

The Worlds Best Outhouse 4K

What happens here

Construct an open-bottom box using 3/4-inch pressure-treated plywood for the sides and 2x4s for internal bracing. The dimensions should fit snugly into the excavated pit. Secure the plywood pieces together with 2-inch or 3-inch T25 screws, ensuring a robust structure. Once assembled, use the mini-loader with a strap attachment to carefully lower the wooden liner into the pit. Position it centrally and ensure it is level, making minor adjustments to the pit floor if necessary.

Goal: Assemble a durable wooden liner using pressure-treated plywood and 2x4s, then carefully lower it into the excavated pit to create a stable and defined waste containment structure.

Tools and materials

  • 2x4 Pressure-Treated Lumber
  • 3/4-inch Pressure-Treated Plywood
  • Level
  • Mini-loader with Strap
  • Power Drill/Driver
  • T25 Screws (2-inch or 3-inch)

What they say

Hide

okay so list of ingredients uh we're using three quarter inch plywood green treated we're using two by fours green treated and my coffee with Coke dude that is my favorite we're using T25 screws what are these three inchers Frankie these are toys foreign just building a 4x4 box right with a top we're gonna put a top over over the over it so that we gotta sturdier floor to sit on yep yep simple open bottom and then underneath that we dig deeper right yep yep that's when the real digging begins if we can get Zach to keep moving we like we like giving you that crap what do what I'm doing that and then that around that I have no clue what you even said I don't even know what you said so this box goes in this hole and then we put a top on it and then we put the in the hole Yeah and then the building goes over the top of that yeah so right now we're just doing the easy part the whole dig pretty well for there year four but my in my experience anytime you've got to put a 4x4 box in the hole you got to go four and a half or five well yeah you gotta go four four or something you know something a little bit bigger something bigger but you'll you'll figure that out pretty fast when the Box the four by four boxes and particular 4x4 hole fair enough because it never works that way in dirt work just saying so the material we're Excavating actually going on the outside of the hole to build that grade up so that the building itself and the Outhouse itself is higher than the grade around it so everything will wash and roll away from the Outhouse and not into it [Music] and if you don't like watching a 27 minute video on an outhouse or just tell Zach to learn to shovel faster so the video can be shorter [Music] thank you [Music] oh yeah yeah before that we can pull that tree up after we get the alt house put in place now what keeps you what you're gonna um what keeps driving what's going to keep that in place keep putting place you know when comes here with something I don't know gravity so this is the top and then we're gonna put a piece of plywood over the top then cut our hole in and we're just using some of the filter I'm gonna take this out with me and just kind of just bring a 4x4 sheet back okay it sounds like the plan all right Frankie I think what I'm gonna do is I'm gonna lift up I'm gonna come in this way to try to set it down okay but yeah that'll be the the least obstructions