Screed the Paver Setting Bed
0:20
0:38
1.9K views
At 0:20 in
the stone our pavers sit on. #paverpavers #pavers #hardscape
What happens here
A worker is shown actively leveling the layer of smaller chips. This is achieved by placing 'screen pipes' (often called screed rails) on the base material to act as guides for a consistent height. A long level, functioning as a screed board, is then pulled across these pipes to remove excess material and fill any low spots. This process creates a perfectly flat and evenly pitched surface, which is critical for the pavers to sit flush and for water to drain correctly from the patio area. The worker confirms that this material is as easy to work with as the older 'screenings' material.
Goal: Achieve a perfectly level and consistently pitched surface for laying the pavers.
Tools and materials
- Level Unspecified — Used as a straight edge (screed board) to flatten and level the chip layer between the screed pipes
- Screen Pipes Unspecified — Acting as guide rails for the screed board to ensure a consistent depth and level of the setting bed
- Smaller Chips Unspecified — The aggregate material being leveled to form the paver setting bed