Haul and Spread Crushed Aggregate
5:58
40:28
56.3K views
At 5:58 in
The SIMPLEST Way To Install A Paver Walkway (That Won't Sink!)
What happens here
A large quantity of 3/4 inch crushed aggregate is delivered to the site via a dump trailer. The mini skid steer is then used to efficiently spread this aggregate evenly over the geotextile fabric, creating the primary base layer for the paver pathway. Care is taken to ensure consistent coverage and initial leveling.
Goal: Establish the main structural base layer for the paver pathway.
Tools and materials
- Dump trailer — Transporting and dumping crushed aggregate
- 3/4 inch crushed aggregate — Creating the main structural base layer
What they say