Skip to main content

Haul and Spread Crushed Aggregate

5:58
40:28
56.3K views

At 5:58 in

The SIMPLEST Way To Install A Paver Walkway (That Won't Sink!)

What happens here

A large quantity of 3/4 inch crushed aggregate is delivered to the site via a dump trailer. The mini skid steer is then used to efficiently spread this aggregate evenly over the geotextile fabric, creating the primary base layer for the paver pathway. Care is taken to ensure consistent coverage and initial leveling.

Goal: Establish the main structural base layer for the paver pathway.

Tools and materials

  • Dump trailer — Transporting and dumping crushed aggregate
  • 3/4 inch crushed aggregate — Creating the main structural base layer

What they say

Hide

did it." And you will be satisfied. Okay, so we'll get to that now . This will be a big day. Our Humpty Dumpty trailer brought us a bunch of stuff. 3/4 inch crushed stone , a very abrasive stone. This will help with compacting the entire site. As for compaction, I went to the local Tate Rents and picked up a vibrating plate. By the way, I recently heard from my excavator driver Tanner. You've seen him on the channel many times. He helped us with the house, helped...well, not really helped, I helped remodel his parents' garage. He calls her PL, what does he say there? "Whacker". And I thought that was the coolest name—" Wacker." So I went into the Tate. And he said, "Guys, I've come to pick up my Wacker." And they understood exactly what I needed. Okay , let's dump this, grab the forklift, and get to work. But first we need geotextile fabric. Well, what's a street project without breaking a sprinkler or damaging an irrigation line. So here, before we start laying the foundation, I stopped by the construction hypermarket for materials. We need to finish the work on the pergola. We took Sharpie markers. We need caps for the PEX pipes because we accidentally turned on the water in the shower and it sprayed everywhere. But in our situation, we need our reliable couplings. The sprinklers have been repaired. The fabric is spread out. Now let's dump the stone and drive the loader here. Devil. The loader is behind us, and we just laid down the fabric. And if you know these things, they will grab onto the fabric and tear it to pieces. Damn it. OK. Let's see how careful we can be with such heavy equipment. The whole secret is to align it so that you don't have to turn it to the sides. I hope a direct flight without stops will work. At least theoretically , but you know how it is with theories. Don't suspect. No, don't suspect. Hey, Kyle, be honest. Would I really get angry if a skid steer drove over, say, the street rug near our house? I mean, I have a conceptual proof. This is where it matters. Right here. We might get kicked out of here. Oh, baby. Lower this bucket so we don't tip over. Nothing can stop us now, baby. With this song, nothing will stop us. The worst is behind us. I'm going to put on my pants now. I'm going to put on my pants now . The choice was made. I urgently needed to go to the toilet. I had several options. I could take off my gloves or leave them on and do the job. I won't say which option I chose, but I'll have to take a long shower…

Auto-generated from the video audio.