Apply Second Layer of Polymeric Sand

0:23
0:28
3.1K views

At 0:23 in

The most tedious part of a paver patio project. #hardscape #paverpatio

What happens here

Following the inspection and confirmation of settled sand, proceed with a second application of polymeric sand. This involves spreading more sand over the pavers and sweeping it into the joints, aiming to fully fill them to the top. This final layer, once compacted and activated with water, will lock the pavers in place.

Goal: Fully fill paver joints with polymeric sand.

Tools and materials

  • Eye Protection — Protecting eyes from airborne sand particles
  • Polymeric Sand — Fully filling paver joints
  • Push Broom — Spreading and sweeping the second layer of polymeric sand