Skip to main content

Manage Machine Attachments

0:35
16:31
159K views

At 0:35 in

The HOA Screwed me out of $10,000 !

What happens here

After using the snow bucket, prepare to switch to a different attachment if needed, such as a snow pusher. This involves raising the current attachment, inspecting the quick-attach mechanism for cleanliness and proper function. Manually clear any hard-packed snow or ice from the attachment plates and pin holes to ensure a secure connection. The video demonstrates this by clearing snow from a sledge bucket and then attaching a snow pusher, ensuring it locks properly.

Goal: Ensure proper functioning and secure attachment changes

Tools and materials

  • ASV RT-75 Posi-Track — Operating the quick-attach system and lifting attachments
  • Snow Bucket Sledge Bucket — The attachment being removed or inspected
  • Snow Pusher Attachment — The new attachment being connected for different snow removal tasks