Laying Retaining Wall Blocks
0:45
12:55
134.6K views
At 0:45 in
The General Contractor Threatened me
What happens here
Workers begin laying the first courses of the retaining wall blocks in the prepared trench. Each block is carefully placed and leveled using a small hand level to ensure the wall is straight and plumb. This process requires precision and continuous adjustments. The base is also compacted using a plate compactor to ensure stability.
Goal: Construct the base and initial layers of the retaining wall.
Tools and materials
- Hand Level — Ensuring each block is level and plumb
- Laser Level — Maintaining consistent elevation and grade along the wall
- Plate Compactor Honda GX — Compacting the base material and backfill behind the wall
- Retaining Wall Blocks — Building the wall structure
- Rubber Mallet — Adjusting block placement without damaging them
- Shovels — Spreading gravel and dirt for leveling
- Gravel — Providing a stable, well-draining foundation for the blocks