Curing the Pavers
At 0:20 in
The finishing touch 🤌..@romexhardscapes #hardscape #hardscaping #patio #patiodesign
What happens here
Conduct a very final, gentle misting or rinsing of the entire patio surface. This step ensures any last traces of polymeric sand dust are washed into the joints or off the paver tops. It is essential to avoid creating puddles on the paver surface. Once complete, leave the patio undisturbed to allow the polymeric sand to cure and harden. This curing period typically lasts 24-48 hours, depending on the specific product and weather conditions. During this time, avoid foot traffic, vehicular traffic, rain, or irrigation. The video concludes with a view of the clean, filled patio, ready for curing.
Goal: Allow the polymeric sand to fully cure and stabilize the pavers.
Tools and materials
- Garden hose — Final gentle rinse
- Spray nozzle — Applying water in a fine mist