Excavate the Basin Hole and Form the Hill

2:09
22:54
646.9K views

At 2:09 in

The Bible of Ponds, Pondless waterfalls, fountains & water features -Everything from Start to Finish

What happens here

Tools and materials

  • Level
  • Shovels
  • Aquabasin (pondless waterfall basin)

What they say

Hide

it's just that it's like another half an hour of time. The soil from the hole for your basin becomes the hill for the waterfall. Work this waterfall about 14-15 inches above the greatest, or above our grade here. So if you're thinking of the great in the backyard, let's just all this our patio. If all you guys can pretend that this is a patio right here and we're bringing that water feature right up to the edge of the patio, I'm going to sink this thing down so it's about two inches lower than my patio. If I want to be the most profitable water feature inside the company in the country, all I would do is install aqua basin. Efficiency is the key and that means getting familiar with your materials. He recommends sticking with the same material over and over again. On every single one of his jobs, he tries to use field stone and weathered limestone. Characteristics to it, a lot of flat edges. Often it's covered in mosses and lichens. This stone here costs us 275 a ton, where this stone here costs us 106 a ton. To a customer, we charge a customer 225 a ton for this, and we charge them 425 a ton for this. The main reason I charge him 425 a ton for this is I have to go hand pick every single one of these. What would be other reasons as a pond builder, you want to use the same type of stone every single time. Practice makes perfect with that stone. Practice you'll get better and better and better, right? Every single day, I'm using granite holders. I start understanding the characteristics and the properties of that stone. I understand how water is going to hug a granite holder and then maybe leave a weathered limestone rock because of the characteristics of it. If I have leftover, where does it go? For the next job. If I have a lot leftover, I could use it on the next job because all of my projects I'm building on the same type of rock. Members, this was my patio right here. I want this thing at minimum of an inch and a half to two inches lower than the height of my patio. The reason as a water feature looks more natural, sunken. So make sure it's always lower than my viewing area.

Auto-generated from the video audio.