Project Introduction and Initial Assessment

0:00
18:16
65.3K views

At 0:00 in

Testing the NEW skid steer on slick wet clay

What happens here

The operator introduces the project, which involves moving a large pile of excavated soil (fill dirt) from a newly installed pool area. The goal is to load this dirt into a dump truck and then grade a nearby steep, wet slope. The initial challenge is immediately apparent as the soil pile consists of frozen topsoil and very wet, clay-like material underneath, making it difficult to load. The operator also points out a steep, aggressive slope that needs to be graded.

Goal: This step provides an overview of the earthmoving project, including the objective of removing excavated soil from a pool site and grading a challenging, steep slope with difficult soil conditions.

Tools and materials

  • ASV RT-75 Compact Track Loader — Main equipment for earthmoving, loading, and grading
  • Dump Truck Unspecified — Transporting excavated soil off-site

What they say

Hide

all right guys let's show you what we got going on today the pool is in on this project and all the fill that when they were digging the pool they cast over here to the side so we've got to get all this out and that means basically what we're going to be doing is taking the asv and bringing the dump truck in and getting it loaded up and then over here is where it gets to be a little bit challenging it's a pretty steep grade that's a pretty aggressive slope and it's kind of wet so we're gonna see if we can straighten it up or if we can't i don't know