Initial Grading with Skid Steer and Bucket
7:56
27:53
189.3K views
At 7:56 in
Testing a new skid steer Regrading a site
What happens here
After all initial clearing is complete, prepare the ASV RT-50 Posi-Track skid steer by attaching the bucket. The goal is to establish a rough grade for a future swimming pool area and surrounding flat spaces for events. The existing ridge needs to be leveled down, and new grade lines will be established for proper drainage. Use the bucket to scrape and move soil, working towards the desired elevation and contours.
Goal: Establish a rough grade for the swimming pool and event areas.
Tools and materials
- ASV RT-50 Posi-Track Skid Steer ASV — Performing the grading work
- Bucket Attachment — Moving and leveling soil
What they say
(733 characters)Hide
What they say
(733 characters)Auto-generated from the video audio.