Leveling and Placing First New Tier
9:47
31:22
10.5K views
At 9:47 in
Teaching a Laborer TO THINK like a LEADER #1
What happens here
The area where the first new tier will be placed is meticulously leveled using sand. The helper distributes the sand evenly and then compacts it. The first set of new railroad ties is then carefully positioned on this leveled sand. A spirit level (Milwaukee Redstick) is used to verify that the ties are level from side to side and have a slight forward pitch to facilitate water drainage, preventing pooling and potential rot.
Goal: Establish a level and stable first tier for the staircase.
Tools and materials
- Railroad Ties — Forming the stair treads
- Spirit Level Milwaukee Redstick — Checking the levelness and pitch of the railroad ties
- Leveling Sand — Creating a stable and pitched base for the ties
What they say
(2,500 characters)Hide
What they say
(2,500 characters)Auto-generated from the video audio.