Introduction and Project Overview

0:00
18:47
58.6K views

At 0:00 in

Swimming hole build!

What happens here

The presenter, Josh from Stoney Ridge Farmer, introduces the project: expanding an existing small pond into a larger watering hole for his cattle. He explains that heavy machinery, specifically a Caterpillar 953C track loader, is being used to clear trees and construct a dam. Initial preparations included using a laser to shoot the grade and marking the dam's location. The goal is to flood the area, leaving some trees for fish habitat, but the primary purpose is a cattle watering hole. Various trees like maple and poplar are targeted to be cut into saw logs for future use on the farm.

Goal: Understand the project scope and initial preparations for building a larger pond

Tools and materials

  • Laser — Shooting the grade for pond depth and dam construction
  • Marking paint/flags — Marking the top of the dam and other critical areas