Final Positioning and Disconnecting Equipment

5:50
13:26
18.5K views

At 5:50 in

Stuck in the MUD Pulling a HOUSE up a hill 4K

What happens here

The last phase of positioning involves intricate maneuvers to ensure the mobile home is perfectly aligned with its permanent foundation. This requires alternating pushing with the backhoe and precise adjustments using the Platypus. Once the house is definitively in place, with all necessary clearances met, the chains and hitches connecting the backhoe and Platypus to the mobile home are carefully disconnected and secured, signifying the completion of the transport phase. The equipment is then moved away from the immediate work area.

Goal: Conduct the final precise alignment of the mobile home on its permanent foundation, incorporating both the backhoe and the Platypus, before disconnecting all temporary moving equipment.

Tools and materials

  • Backhoe Loader
  • Crowbar/Pry Bar
  • Platypus Remote-Controlled Tracked Dolly
  • Safety Gloves