Skip to main content

Spread Initial Concrete Layer

0:00
1:01
21.1K views

At 0:00 in

STONG Concrete Bench #MrBuildit #shorts #diy

What happens here

Begin by carefully pouring and spreading the concrete mix into the custom plywood formwork. Use gloved hands or a trowel to evenly distribute the concrete across the bottom of the form, ensuring it covers the entire surface to a consistent depth. The presenter specifically mentions aiming for a depth of approximately 1.5 inches for this initial layer. This layer serves as the base upon which the steel reinforcement will be placed.

Goal: The first step involves spreading a base layer of concrete into the prepared plywood formwork to establish a foundation for the reinforcement.

Tools and materials

  • Gloves
  • Plywood Formwork
  • Trowel (optional)
  • Concrete Mix

What they say

Hide

so I got the first inch and a half done uh the reason why I'm pausing here is because I want to lay down steel reinforcement that way when this stuff expands or contracts this thing ain't gonna crack and it's going to be the strongest piece of concrete that I have probably ever made no that's false I made something thicker than this about three and a half inches anywho I'll cut it a size lay it down and then cover it with the rest of the concrete oh and by the way you like my shirt break something to learn something model of my day go pick one up in the description

Auto-generated from the video audio.