Securing Top Course and Patio Base Preparation
At 11:03 in
Starting a new hardscaping job- pt1
What happens here
After the retaining wall courses are completed, the top course of blocks is secured using construction adhesive. Apply a bead of adhesive along the top surface of the preceding block course before placing the final blocks. This helps lock the top course in place and provides additional stability. Following this, the base for the patio area is prepared adjacent to the retaining wall. Spread a layer of Class 5 granular material, then use the screed bar to level it accurately. Finally, compact the leveled granular base using the vibratory plate compactor to create a solid, stable foundation for the eventual paver installation.
Goal: Glue the top retaining wall course and prepare the patio's granular base.
Tools and materials
- Construction Adhesive — Securing the top course of retaining wall blocks
- Leaf Blower Makita — Clearing debris from the patio base before laying pavers (implied)
- Screed Bar — Leveling the granular base for the patio
- Vibratory Plate Compactor Tomahawk — Compacting the granular base
- Class 5 Granular Material — Base material for the patio
What they say
(1,063 characters)Hide
What they say
(1,063 characters)Auto-generated from the video audio.