Continuing Retaining Wall Construction
9:25
13:43
63.7K views
At 9:25 in
Starting a new hardscaping job- pt1
What happens here
Continue building the retaining wall by stacking additional courses of Versa-Lok blocks. After each course of blocks is laid, place a layer of geo-grid, ensuring it extends into the backfill area. The geo-grid ties the blocks together and prevents the wall from bulging or shifting. Backfill the area behind the blocks with recycled Class 5 granular material. Use a plate compactor and a hand tamper to thoroughly compact the backfill in lifts (layers of 6-8 inches) to ensure stability and prevent settlement. The base and the geo-grid must move evenly to avoid cracking.
Goal: Build up the retaining wall courses with geo-grid and compacted backfill.
Tools and materials
- ASV RT-50 Compact Track Loader ASV — Transporting and dumping backfill material
- Geo-grid — Structural reinforcement between block courses
- Hand Tamper — Compacting backfill in tight spaces
- Shovel — Spreading backfill material
- Vibratory Plate Compactor Tomahawk — Compacting backfill material
- Recycled Class 5 Granular Material — Backfilling behind the retaining wall
What they say
(1,412 characters)Hide
What they say
(1,412 characters)Auto-generated from the video audio.