Test Fit the Post
0:07
1:02
9.7K views
At 0:07 in
Sometimes we all just need a little extra support!
What happens here
The installer begins by attempting to place a square metal deck railing post onto a pre-installed base plate on the composite deck surface. The post doesn't immediately seat properly, leading to an inspection of the base plate and the bottom of the post, likely to check for obstructions or ensure correct alignment before proceeding. The goal here is to achieve an initial fit and ensure the post is oriented correctly.
Goal: Ensure the post fits correctly onto its base.
Tools and materials
- Composite Decking — The surface onto which the deck post is being installed
- Deck Post Base Plate — The existing hardware on the deck surface designed to receive the post
- Metal Deck Railing Post — The main component to be installed as part of the deck railing system