Prepare for Field Operation and Final Checks
9:06
10:36
64.6K views
At 9:06 in
RUSTY OLD HAY EQUIPMENT WORKING.....INJURY SENDS US TO THE HOSPITAL
What happens here
With all maintenance and connections complete, the final step is to prepare the haybine for operation in the field. Use the tractor's hydraulics to lower the haybine's cutting bar and rollers into the operational position. Engage the PTO and slowly drive the tractor forward to test the haybine's functionality. Observe the cutting and conditioning mechanisms to ensure they are working smoothly and without unusual noises. This check confirms the haybine is ready to begin cutting hay in the field.
Goal: Confirm the haybine is fully operational and ready to cut hay.
Tools and materials
- Hearing Protection — Protecting ears from loud machinery noise
- Tractor John Deere — Operating the haybine in the field
What they say
(283 characters)Hide
What they say
(283 characters)Auto-generated from the video audio.