Skip to main content

Prepare for Field Operation and Final Checks

9:06
10:36
64.6K views

At 9:06 in

RUSTY OLD HAY EQUIPMENT WORKING.....INJURY SENDS US TO THE HOSPITAL

What happens here

With all maintenance and connections complete, the final step is to prepare the haybine for operation in the field. Use the tractor's hydraulics to lower the haybine's cutting bar and rollers into the operational position. Engage the PTO and slowly drive the tractor forward to test the haybine's functionality. Observe the cutting and conditioning mechanisms to ensure they are working smoothly and without unusual noises. This check confirms the haybine is ready to begin cutting hay in the field.

Goal: Confirm the haybine is fully operational and ready to cut hay.

Tools and materials

  • Hearing Protection — Protecting ears from loud machinery noise
  • Tractor John Deere — Operating the haybine in the field

What they say

Hide

all the hay we'll need for this year little emergency my wife just called me in said the dog ran out in front of her and she fell down the stairs cuz she thinks she burped her arm keep you guys posted got about half the fields mode sometimes life does things like this do you [Music]

Auto-generated from the video audio.