Skip to main content

Set Block Courses & Geogrid

6:24
14:39
161.3K views

At 6:24 in

Retaining walls- what 99% of people don't know

What happens here

After installing the drainage layer, continue setting additional courses of concrete retaining wall blocks. Ensure each block is properly aligned and level. To enhance stability and reinforce the wall, lay geogrid (geotextile reinforcement mesh) between specific courses of blocks. The geogrid should extend horizontally into the backfill, and the next course of blocks is placed directly on top of it, securing it in place. The video also demonstrates how to cut blocks using a hammer and chisel (or a block splitter/saw) to create custom sizes like half-units or corner units, which allows for versatile and precise wall construction without ordering specialty blocks. This method helps maintain color consistency with the main blocks.

Goal: Construct the main body of the retaining wall with reinforcement.

Tools and materials

  • Block Splitter — Mechanically splitting blocks
  • Chisel — Cutting blocks for custom sizes
  • Concrete Blocks Versa-Lok Standard — Building the retaining wall
  • Hammer — Cutting blocks with a chisel
  • Saw — Precision cutting blocks
  • Geogrid — Reinforcing the retaining wall layers for added stability

What they say

Hide

so [Music] and now i'm putting a knee on this one and stuff this one's already locked in so that's good to go that's just that one that we're locking in right now so don't worry don't worry i ain't stepping on loose base blocks

Auto-generated from the video audio.