The Bobcat is used for spreading the final layer of topsoil, and hand tools like rakes are used for fine-tuning the grade. The professional conducts a walk-through of the completed area, visually demonstrating how the new contours of the landscape will effectively channel rainwater away from the foundation and towards the installed French drain system. This final step ensures that the primary goal of preventing water logging and basement issues is achieved.

Goal: The final layers of topsoil are spread and meticulously graded to ensure a perfect slope, visually demonstrating the effective redirection of water away from the house.

Tools and materials

  • Bobcat Skid Steer (S185)
  • Laser Level
  • Rake
  • Topsoil N/A

What they say

Hide

problem and the reason we go to so much work is I'm a firm believer in keeping the water out no interior drink tile is an option but I've always tried to keep the water from penetrating and getting inside in the first place once you do that you don't need interior drink time well with the retaining wall completed and the ability to raise the grade at the back of the house we now need to borrow the dirt from the side of the house and try to get all of the water to flow from the back all the way down the side and to the street so as we're cutting the grade Todd's gonna be using the laser to make sure that we got all of the elevation and pitch running the right way so it is to lay the flea [Music] you [Applause] [Music] [Applause] so no matter how careful we are you can still have problems which you're actually going to see in just a few minutes because this soil is semi loose we haven't done any compaction on because we do want to re-establish vegetation on it and then what happens to us is before the vegetation actually gets established we get a pretty big rain come down well it was a couple day gusher and it kind of messed up our grades so you'll see that in a minute all right you guys when we wrap this job up for the most part we're actually on down the road but we were just doing a little check-in and discovered a couple problem areas that need to be addressed now first off when we say we wrap this job up you'll be looking at going well there's dirt there's not grass here well a lot of times we actually like to leave a little bit of what we call sweat equity in the job now we could have seeded this we could have soldered this for the customer or we can let them do that themselves and save some money and a lot of times we just give them a sense of direction how to do it themselves and these guys don't mind tackling it on their own in fact this customer actually wanted us to leave some extra dirt behind so that they could do some other stuff around their house and we're glad we did because we do have to come back and touch up a few spots that I want to show you in a minute but before I show you those problem areas let's take a look at how the wall turned out here now this is a downspout so all the water is designed to come out in a way before it used to go right into the house big problem so now you can actually see from the rain how everything is flowing a good amount away from the house going down that way and now they have a dry basement that's because…