Sculpting the Slope with Structural Fill
At 2:30 in
Rebuilding a FAILED retaining wall & Testing NEW Equipment 4 k video
What happens here
Approximately 288 cubic yards of dirt are brought onto the site to re-sculpt the slope. The ASV RT-75 skid steer is used to carefully spread this structural fill material across the hillside. The process involves multiple passes, using the bucket to push and distribute the soil to achieve the desired grade and contour for the new slope. This structural fill forms the bulk of the new landform, providing a stable base before the application of topsoil. The existing retaining wall that was not completely removed is buried beneath this new fill, with its top courses removed to prevent future exposure. This careful layering and grading are crucial for long-term stability.
Goal: After removing the old wall, a significant amount of structural fill soil is brought in and meticulously spread across the reshaped slope to establish the new grade and ensure stability.
Tools and materials
- Standard Bucket Attachment
- Structural Fill Soil
What they say
(1,736 characters)Hide
What they say
(1,736 characters)Auto-generated from the video audio.