Phased Demolition and New Wall Construction
At 13:36 in
Rebuilding a Collapsing Driveway and Retaining wall
What happens here
To prevent potential driveway damage from weather (like heavy rain) and reduce exposure, the project adopts a strategic phased approach. Sections of the old retaining wall are removed one at a time, and the corresponding section of the new boulder wall is immediately constructed. This minimizes the duration of exposed, unstable ground. The remaining demolished material is continually moved to the spoil pile using the skid steer. Building the wall from behind (from the driveway side) is more challenging due to limited visibility of the boulder placement, requiring constant communication between the excavator operator and the ground spotter to ensure correct positioning and structural integrity.
Goal: Build the new boulder wall in sections immediately after demolition to maintain stability and prevent damage.
Tools and materials
- Boulder Stones — Constructing the new retaining wall
- Daewoo 75V Excavator Daewoo — Demolishing old wall sections and placing new boulders
- Filter Fabric — Separating soil layers, preventing migration, and improving drainage
- Geogrid — Reinforcing the backfill behind the retaining wall for added stability
- Hydraulic Thumb Attachment — Precisely maneuvering boulders
- Rake — Spreading aggregate and grading
- Shovel — Minor adjustments and leveling during boulder placement
- Volvo MC115C Compact Track Loader — Moving demolished material and backfill
What they say