Skip to main content

Remotely Unload Lumber at Project Site

10:54
19:13
14.5K views

At 10:54 in

REAL Equipment skills.

What happens here

Upon arriving at your project site, position the trailer for optimal lumber placement. Use the remote control provided with the 'Advanced Nimble Trailer System' to activate the conveyor belt mechanism. The entire stack of lumber will smoothly and quickly slide off the trailer bed, forming a neat pile on the ground. This remote-controlled unloading process minimizes manual effort, saving time and labor when handling large quantities of lumber for your planters, raised beds, or edging projects.

Goal: Utilize the trailer's remote-controlled conveyor system to efficiently and neatly unload the entire stack of lumber directly at your garden project area.

Tools and materials

  • Remote Control
  • Lumber Load

What they say

Hide

happens we'll be filming we're rocking and rolling all right we're rocking and rolling think we can unload it without touching it frankie are we good is it all out that's about as fast as i've ever unloaded huh sounds like i need to lube up that chain though

Auto-generated from the video audio.