Skip to main content

Install Top Course & Pinning

10:03
11:27
151.7K views

At 10:03 in

Prt 1: Retaining wall blows out -fast Repair

What happens here

Carefully place the top course of blocks, including the custom-split corner caps, onto the wall. Each block must be precisely aligned so that its pin holes fit onto the pins of the block below. This is a very precise procedure, often requiring minor adjustments and mallet taps to ensure a perfect fit. The final blocks should sit level and securely. Once the top course is complete, the entire wall is capped, providing a finished look and completing the structural integrity.

Goal: Install the final course of retaining wall blocks and the custom-prepared corner caps, aligning the pin holes with the base pins for a secure, finished wall.

Tools and materials

  • Custom Corner Cap Blocks
  • Retaining Wall Blocks (top course)
  • Rubber Mallet

What they say

Hide

they knock down any high ridges or inconsistencies but they've still got one roll of blot to staff before they can cap the entire wall to get these blocks to connect they have to line up the pin holes on the top with the pin slots on the bottom it's a very precise procedure Sam slides a block across the top course prepping it for the calf to come next on the next part of this video we finished capping the wall fill in all of the ruts in the yard finish the back filling and wrap up this entire project god bless and go get em you guys

Auto-generated from the video audio.