Prepare and Assess Floor Joints
0:10
4:59
1.6K views
At 0:10 in
Professional Epoxy Guys Use THIS Trick for Saw Cuts!
What happens here
After applying the Rust-Oleum EP-55 water-based epoxy primer and allowing it to dry for approximately 5 hours, inspect the floor for visible saw cuts or control joints. These joints, previously filled, may become visible due to the original filler shrinking. The objective is to make these joints disappear completely before applying the main base coat of the metallic epoxy floor. Prepare multiple trowels or putty knives of varying sizes to find the most suitable tool for achieving a super tight skim coat, as sanding will not be performed after this step.
Goal: Identify and prepare visible saw cuts on the primed epoxy floor for filling.
Tools and materials
- Putty Knife — Applying and skimming the epoxy Cab-O-Sil, especially for tighter applications
- Trowels — Applying and skimming the epoxy Cab-O-Sil. Having multiple sizes helps determine the best fit for precise work
What they say
(1,233 characters)Hide
What they say
(1,233 characters)Auto-generated from the video audio.