Maneuver Massive Boulder with Multiple Excavators
21:40
32:03
12.2K views
At 21:40 in
Pond BUILD! Day 2- sketchy
What happens here
The construction of the pond necessitates the careful maneuvering of a massive boulder, weighing an estimated 4 tons. This requires the synchronized operation of two Kubota excavators (a KX040-4 and an SVL 97-2), along with multiple team members guiding the boulder using heavy-duty straps. Extreme caution and coordination are essential due to the boulder's immense size and weight, pushing the equipment and human effort to their limits for precise placement.
Goal: Precisely place a 4-ton boulder using a coordinated effort of two excavators and manual guidance.
Tools and materials
- Heavy-duty Lifting Straps — Securing the boulder for lifting by the excavators
- Kubota KX040-4 Excavator Kubota — One of two excavators used to lift and position the massive boulder
- Kubota SVL 97-2 Compact Track Loader — The second excavator, working in tandem to move the boulder
- Massive Boulder — A key aesthetic and structural element of the water feature
- Safety Boots — Protecting feet from heavy objects
- Safety Helmets — Protecting heads from falling debris or impacts