Implement 'Inside-Out' Pond Construction
At 7:17 in
Pond BUILD! Day 2- sketchy
What happens here
Due to limited space around the pond, the construction crew employs an 'inside-out' building technique. This involves repeatedly rolling back sections of the pond liner, placing temporary boards for workers and machinery to move across, constructing part of the rock wall or feature, and then unrolling the liner as they work their way out. This iterative process is crucial for working in tight areas without damaging the liner or surrounding landscape. Heavy boulders are again placed with precision, often requiring multiple team members to guide them into position while suspended by the excavator.
Goal: Construct pond features in a confined space using the 'inside-out' method
Tools and materials
- Kubota Mini Excavator Kubota — Lifting and positioning boulders
- Lifting Straps — Securing boulders
- Pond Liner — Forming the watertight base of the pond
- Shovels — Adjusting smaller rocks and soil
- Temporary Wooden Boards/Plywood — Creating safe walking surfaces over the liner during construction
- Underlayment — Protecting the liner from punctures
- Work Boots — Foot protection and traction