Plan and Assess Pipe Route
At 0:00 in
Plumbing up the Septic Tank...Never thought it would be FUN! #plumbing #farming
What happens here
Begin by assessing the existing trench and any pre-installed pipe sections. Observe the angles of the trench and the direction the pipe needs to travel. In this case, the presenter identifies that the current angle of the trench and existing fittings (a 90-degree elbow shown) will not provide the straightest path or the fewest turns desired for efficient drainage. This initial assessment helps determine the types of fittings required and if any adjustments to the trench or pipe route are necessary. The presenter notes a potential need to visit a hardware store like Lowe's for specific angled fittings and considers starting the pipe laying from a different end to better plan the route.
Goal: Determine the optimal pipe layout and identify necessary fittings.
Tools and materials
- PVC 90-degree Elbow — An existing fitting used for initial assessment of angles
- Trench N/A — The channel dug for laying the drainage pipe